Our installation team builds hundreds of home gym racks each year. This guide shares what they've learned along the way: the tools that make the job manageable, why you need a second pair of hands and the parts of the build that catch people out.
While every rack is different, these are the general pointers that will apply to most builds.



The essentials
- 1.Decide where your rack is going to live before you start. Once it's built, it's too heavy to move without taking it apart. Clear the room, check your ceiling height with our rack height checker and leave space either side for loading plates.
- 2.Only finger tighten the bolts as you go. Tighten everything fully once the rack is completely built and lined up.
- 3.Build it with two people. This isn't a nice to have. We explain why below.
The tools you need
Two good quality spanners
You need two spanners that fit the main bolt size on your rack. One holds the nut still while the other turns the bolt. Even with an impact wrench, you'll still need a spanner on the nut side.
Check your manual for the bolt sizes on your rack, then use this table to find the spanner size.
| Bolt size | Spanner or socket size |
|---|---|
| M10 | 17mm |
| M12 | 19mm |
| M16 | 24mm |
| M20 | 30mm |
| M24 | 36mm |
An impact wrench (socket gun)
We highly recommend an impact wrench (socket gun). The main bolts need a lot of torque, and tightening them by hand is slow and tiring. Our installers get through two to three battery charges on every build.
Don't have an impact wrench? A manual socket wrench will do the job, but expect to spend around a minute on each bolt.
Why you should only finger tighten initially
As you're assembling the rack, it's important to finger tighten the bolts only until the build is finished. This is because you'll need some give in the frame to install things like the pull-up bar and Smith machine.
The main bolts come with nylon lock nuts. During the build, only tighten these until the bolt reaches the nylon insert. You'll tighten everything properly at the end.
Why it's a two-person job
Parts of the build need one person holding a piece above their head while the other bolts it in. Some parts of our racks weigh up to 25kg, so this isn't possible to do on your own.
Common issues
These are the pain points that you're most likely to run into when building a gym rack.
If your rack has cables
Cable tension
The most common issue we see customers run into is threading their cables too tightly. You'll know this is the case if the top weight plate is lifted slightly off the stack, even when not in use.
You can adjust the tension of your cables by bolting the cable into a different hole on the trolley, the part that slides up and down the upright.
Move the bolt to a lower hole to reduce tension and fix a raised top plate.
Sometimes, though it's not as common, your cable might be too loose. You'll notice this if the ball end of the cable (the part you train from) hangs limp from the last two pulleys. To fix this, bolt the cable higher up the trolley to increase the tension.
Is the cable caught or twisted?
Once you've finished routing your cables, test how they travel with no weight attached except for the top plate. It should move smoothly the whole way.
If you feel resistance at any point, it's possible that the cable is caught or twisted there. Check that it sits cleanly in the groove of every pulley along its route.
Stretch the cables overnight
Cables can develop twists and knots while in transit. You won't always be able to see it, but it's well worth stretching them out once your rack is built so they run smoothly. Here's how to do it.
- 1.Select about half the weight stack.
- 2.Clip a D-handle onto the cable.
- 3.Pull the cable across to the opposite upright.
- 4.Loop the D-handle over a spotter arm or J-hook on that upright and leave it overnight.
Do this for each cable weight stack to keep your cables running smoothly from the first session.
Oil the guide rods
Once the rack is built, oil the guide rods with a silicone-based oil so the weight plates slide up and down smoothly.
You can buy some silicone oil online or from a retailer like B&Q or Screwfix.
If your rack has floating pulleys
Some of our racks use floating figure-of-eight pulleys that can stump a lot of first-time installers. The instinct a lot of customers have is to try and bolt them in somewhere. You don't need to. A floating pulley is exactly that: it floats, and moves up and down as the cable is pulled.
To install these, thread the pulley as directed in your instruction manual and don't worry about it hanging loose for the time being. Once the whole cable setup has been routed, the pulley will support itself.
The best advice we can give here is to carry on. It'll make sense as you continue threading the cables.
If your rack has a Smith machine
All of our Smith machines run on bearings along two fixed guide rods. If the rods or bearings aren't set up exactly right, the bar won't run smoothly.
One side has more friction than the other
If one side of your Smith machine is sticking while the other isn't, the first thing to do is loosen the connecting bolts slightly to let gravity settle the smith bar. After a couple of minutes have passed, retighten the bolts and the smith bar should be aligned evenly. Be careful not to overtighten the bolts, as this can cause its own set of alignment issues.
If the issue persists, apply some silicone-based oil to both smith bar guide rods in case there's some resistance as the bar travels up and down.
Fit the bearings the right way round
On our Multi-Functional Trainer, the Smith machine runs on bearing brackets which need to be fitted on the outside of the rack, rather than on the inside of the Smith bar.
Installing them on the inside can push the guide rods outwards, causing them to bow and disrupt the alignment and movement of the Smith bar.
Insert counterbalances while the rack is flat
On our Multi-Functional Trainer, the Smith machine uses counterbalances that live inside the machine's rear uprights. If you're working with limited ceiling height, you need to install these while the frame is lying on the ground, as you might not have space above the rack to insert the counterbalances once it's standing and half built.
FAQs
How long does it take to build a squat rack?
Plan for at least a full day with two people, though customers can sometimes spend a full weekend building.
Can I build a squat rack on my own?
We don't recommend it. The uprights, top cross beam and pull-up bar need one person holding them in place while the other fits the bolts.
What tools do I need to build a squat rack?
Two good quality spanners that fit your rack's main bolts and an impact wrench (socket gun). A manual socket wrench works too, but it's much slower.
Should I tighten the bolts as I go?
No. Finger tighten every bolt as you build, then tighten everything fully once the rack is complete and lined up.
How do I know if my cable tension is right?
If the top weight plate lifts off the rest of the stack when the cable isn't in use, it's too tight. Move the bolt to a lower hole on the cable trolley to reduce the tension.
If the ball end of the cable hangs limp from the final two pulleys, then it's too loose. Move the bolt to a higher hole on the cable trolley to increase the tension.
Nov 24, 2026 - Cameron Brierley


Leave a comment: